Written by Casey
|
|
Monday, September 14 2009 21:13 |
The big day (or one of them, anyway): setting the poles in place. They are held 6" off the bottom of the trench with cross bracing, and tacked into place. Lots of alignment and so on. The last 6x8 was just too much for us (Ken did all the hard work) so we called in the troops. Then it was time to replace that incorrect electrical conduit. Hopefully i got it right this time...